DARREN BOWMAN DESIGN

BUILDING DESIGN & DRAFTING

Blog

McManus Drive Residence

Posted by Darren Bowman on February 2, 2012 at 6:15 PM

On a steep site like this the biggest challenge is always getting to floor level. We worked from survey drawings to model the site in 3D to determine heights for this project. According to builder Kane Twomey, the floor levels worked out "spot on". Perfect is good enough for me! With that challenge complete Kane is now framing walls.

Categories: Projects, Sustainable Design (ESD)

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

0 Comments

Blog

by Darren Bowman | 0 comments
by Darren Bowman | 0 comments
by Darren Bowman | 0 comments
by Darren Bowman | 0 comments

Testimonials

  • "We are both absolutely thrilled with how it is shaping up and hope you will be as pleased with it. Please call in and have a look sometime... One especially pleasing aspect is ..."
    Bruce Muir